The framing got done, and the insulation was put up. We were excited to see that they had insulated the inside walls as well as the basement ceiling. This will make the house a lot quieter!
The Stucco is done and the siding is being put up.
Now, the drywall is going up.
(This is looking into the kitchen & breakfast area)
(this is the fireplace wall in the upstairs great room)
(this is the view from the front door, through the great room and out the back deck)
While we were there, they were still hanging the drywall in some of the rooms.
(this is the big guest bedroom downstairs, hint, hint!)
In one of the bedrooms downstairs they needed to box in some of the area for the air conditioning. This will be Landon and eventually Tanners room also.
No comments:
Post a Comment